ABNT ISO TR 10013 PDF

ISO/TR (en), Guidelines for quality management system. . Título: Esta Versão Corrigida da ABNT ISO/TR de , incorpora a Errata . Direct link NBR ABNT iso tr free pdf ISO TR – Diretrizes para a documentacao de sistema de gestao da qualidade(1).pdf. ISO/TR. (E). PDF disclaimer This PDF file may contain embedded typefaces. In accordance ABNT ISO/TR um guia para a.

Author: Yozshujora Dokora
Country: Indonesia
Language: English (Spanish)
Genre: History
Published (Last): 14 June 2006
Pages: 116
PDF File Size: 1.9 Mb
ePub File Size: 3.29 Mb
ISBN: 985-8-61566-172-5
Downloads: 69043
Price: Free* [*Free Regsitration Required]
Uploader: Dilmaran

Records of contract reviews shall be maintained see 4. Part of the evidence required is the result of at least one complete internal audit and management review cycle. Design Validation – Supplemental – 4. Use abnh Design Data – 4.

If in doubt regarding QS applicability, contact your customer. Diamonds also highlight important characteristics on fixtures and gauging procedures during design verification, product validation, or revalidation.

The scope of registration shall include all products and services being supplied to one or more of the companies subscribing to this document. Feasibility is an assessment of the suitability of a particular design, material, or process for production, while conforming to all engineering requirements at the required statistical process capability and at specified volumes.

ISO TR FREE PDF

Should participate in an on-going peer review process with other internationally recognized accreditation bodies. For the purposes of this International Standard, the range and detail of the procedures that form part of the quality system shall be dependent upon the complexity of the work, the methods used, and the skills and training needed t personnel involved in carrying out the activity.

  IAN BREMMER STATE CAPITALISM COMES OF AGE PDF

Laboratories utilized for commercial laboratory services are excluded from this provision. The table applies only to izo product characteristics that are normally distributed. The initial application of product qualification is to use Condition I.

Specific questions on the content of these publications should be directed to the appropriate contact at the GM procuring division. Refer to the customer documents.

Identifies a Key Quality Characteristic of a part, 1001, process or test specification that is sensitive to variation with the potential of degrading customer satisfaction. QS is a contractual requirement for all supplier sites of: Notify ASQ, abnr provider of the sanctioned QS Registered Company Database within ten 10 working days, of all sites registered to QS and of changes in registration status of current registered sites.

Management Representative – 4. The use of small lots with a goal of one piece flow in a synchronous manner is encouraged. Additional information regarding future quality system requirement developments will be communicated as appropriate. Where a qualified laboratory does not exist for a given piece of equipment, calibration services may yr performed by the original equipment manufacturer.

A Chrysler-led Process Sign-Off 100013 be performed for parts that have a high initial risk evaluation as identified by the Product Team or parts that have been out of production for 12 months or 01013. Also, each such location shall receive a surveillance audit at least once in every consecutive twelve month period in accordance with Appendix H requirements. Checklist, Procedure and Forms. Ehlers at Ford, and G. The analytical methods and isp criteria used should conform to those in the Measurement Systems Analysis reference manual e.

  LIETAER FUTURE OF MONEY PDF

Examples of situations which might lead to improvement projects are: The following list shows examples of possible techniques which might be used. Records shall identify the inspection authority responsible for the release of the product see 4.

Contact your SPO buyer for instructions. II 50 Required to switch to Condition I if any sample group has any nonconforming units. Appropriate records of training shall be maintained see 4. Subcontractor Development – 4.

ISO TR 20173

While these services may be contracted, the supplier shall provide technical leadership. Ios by the customer shall not absolve the supplier of the responsibility to provide acceptable product, nor shall it preclude subsequent rejection by the customer. This control shall ensure that: See the Quality System Documentation Progression on page 6 for an illustration of the typical levels of documentation.

The use of customer-designated subcontractors does not relieve the supplier of the responsibility for ensuring the quality of subcontracted parts, abjt and services. Model B report format is preferred.

ISO TR 21074-2016

Key internal quality and operational performance measurables? Lee Suan Hiang Tel. Tooling Management – 4.

Non value-added use of floor space?